Architectural and interior design services for a 205,000 SF 4-story corporate headquarters build to suit office and manufacturing facility for Microvention Terumo, a medical device manufacturer. The contemporary building design features a curved aluminum panel curtain wall and clear grey glazing with large exterior patio spaces. Included in the design are 40,000 SF of clean room, 30,000 SF of laboratory, 35,000 SF of warehouse and distribution including two dock areas and an equipment yard with hazardous material storage, 10,000 SF machine shop, 3,500 SF employee lunch room, extensive training and conference facilities. The site design includes a design build parking structure, bio-swale and tree well integration, and extensive drought tolerant landscaping. The four-story building is a moment-framed structural steel, with a cast-in-place partial basement, curtain walls, and a single-ply roof. The project also included the construction of a four-story, post-tension concrete parking garage with 822 stalls and two elevators.